BSC Changes impacting a CVA Meter Operator Agent
This page shows which Modifications and Change Proposals have been identified as impacting a CVA Meter Operator Agent. Please note that the assessment of where impacts may affect certain roles within the electricity market may be amended during the course of the Change process.
CP1540 ‘Strengthening the Qualification – Change of Ownership Process’
CP1537 ‘Extending the Timescales for agreeing Technical Assurance of Performance Assurance Parties (TAPAP) Findings Reports’
P423 Market-wide Half Hourly Settlement (MHHS) Implementation and Governance Arrangements
CP1544 ‘BSCCo Approved EFR Representative sign-off required for any EFR plan following escalation’
CP1545 ‘Introducing Technical Assurance of Metering (TAM) Central Volume Allocation (CVA) Specific Sample audits’
P429 Switching off Participant-Reported PARMS Serials
P429 will permanently cease the operation of, and remove the obligations associated with, participant-reported Performance Assurance Reporting and Monitoring System (PARMS) Serials and associated Supplier Charges.
CP1554 Future proofing the measurement transformer standards
CP1554 looks to future proof the measurement transformer standards in Code of Practices 1, 2, 3, 4, 5 and 10
CP1553 Meters and Current Transformers minimum accuracy classes
This Change proposal looks to tighten the requirements for Meters and Current Transformers in the Code of Practice.
CP1550 Updates to monitoring of voltage failure alarms requirements
This Change Proposal looks to simplify the management of phase failures and update the requirements of voltage failure alarms.
CP1566 Introducing the CVA Commissioning End to End Check (CEEC) process
CP1566 seeks to formalise the Central Volume Allocation (CVA) Commissioning End to End Check (CEEC) process in BSCP02, BSCP20, BSCP38, CoP4 and CDCA Service Description for new and existing CVA Metering Systems.