List of all BSC Modifications
P405 Allow notices via email where currently prohibited
P405 will allow notices that the BSC currently requires to be sent by post or fax to be sent by email.
P404 Moving the SAD to a Category 3 BSC Configurable Item
P403 BSC Arrangements in the event that the TERRE Market is suspended by National Grid ESO
P402 Enabling reform of residual network charging as directed by the Targeted Charging Review
Following the conclusion of its Targeted Charging Review Significant Code Review , Ofgem directed National Grid and certain LDSOs to make changes to how residual revenues are recovered through Distribution Use of System (DUoS) and Transmission Network Use of System (TNUoS) demand charges.
P401 Governance arrangements for BSC Panel Alternates
To clarify the governance arrangements for BSC Panel Alternates in respect of their contribution to quoracy and voting at BSC Panel meetings. This will help to address ambiguity within the existing arrangements.
P400 BSC Panel Modification Business via Video/Teleconference
P399 BSAD Identity Visibility
P399 seeks to include additional information in the Balancing Services Adjustment Data (BSAD) to identify the assets involved in bilateral trades.
P398 Increasing access to BSC Data
P398 seeks to increase accessibility to data held by Elexon and BSC Agents. It will better align the BSC with the United Kingdom’s Industrial Strategy.
P397 Assessing the costs and benefits of adjusting Parties’ Imbalances following a demand disconnection
P397 seeks to introduce a mechanism through which the Balancing and Settlement Code Company (BSCCo) determines whether certain Parties should carry out the Settlement Adjustment Processes following a DCE.