List of all BSC Modifications

(Showing items 271-280 of 475)

Show 10 | 20 | 50 | 100 | All

P205 – Increase in PAR level from 100MWh to 500MWh

Increase in PAR level from 100MWh to 500MWh
Read More

P204 – Scaled Zonal Transmission Losses

Scaled Zonal Transmission Losses
Read More

P203 – Introduction of a seasonal Zonal Transmission Losses scheme

Introduction of a seasonal Zonal Transmission Losses scheme
Read More

P202 – Energy Imbalance Incentive Band

Energy Imbalance Incentive Band
Read More

P201 – Energy Imbalance Tolerance Band

Energy Imbalance Tolerance Band
Read More

P200 – Introduction of a Zonal Transmission Losses scheme with Transitional Scheme

Introduction of a Zonal Transmission Losses scheme with Transitional Scheme
Read More

P199 Quantification of Demand Control in the BSC as instructed under OC.6 (c),(d) & (e) of the Grid Code

Quantification of Demand Control in the BSC as instructed under OC.6 (c),(d) & (e) of the Grid Code
Read More

P198 – Introduction of a Zonal Transmission Losses scheme

Introduction of a Zonal Transmission Losses scheme
Read More

P197 SVA Qualification Processes Review

SVA Qualification Processes Review
Read More

P196 – Treatment of Long Term Vacant Sites in Settlements

Treatment of Long Term Vacant Sites in Settlements
Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.