Glossary
List of all BSC Modifications
P245 Changes to Long Term vacant Sites Timescales
Changes to Long Term vacant Sites Timescales
P244 – Provision of BritNed flow data to the BMRS
Provision of BritNed flow data to the BMRS
P243 Publication of Generator Forward Availability by Fuel Type
Publication of Generator Forward Availability by Fuel Type
P242 Treatment of Exemptable Generation Connected to Embedded Offshore Transmission Networks
Treatment of Exemptable Generation Connected to Embedded Offshore Transmission Networks
P241 Relaxation of Requirement to Separately Meter Licensable Generating Units
Relaxation of Requirement to Separately Meter Licensable Generating Units
P240 Switching Plant and Apparatus between BM Units
Switching Plant and Apparatus between BM Units
P239 Correcting Manifest Errors and Modifying an Interface in the P217 Legal Text
Correcting Manifest Errors and Modifying an Interface in the P217 Legal Text
P238 Removal of the requirement to Meter each Boundary Point for Offshore Power Park Modules
Removal of the requirement to Meter each Boundary Point for Offshore Power Park Modules
P237 Standard BM Unit Configuration for Offshore Power Park Modules
Standard BM Unit Configuration for Offshore Power Park Modules
P236 Compensation Claims for Metered Volume Reallocation Notification (MVRN) Parties arising from an Outage
Compensation Claims for Metered Volume Reallocation Notification (MVRN) Parties arising from an Outage