List of all BSC Modifications

(Showing items 191-200 of 475)

Show 10 | 20 | 50 | 100 | All

P285 – Revised treatment of RCRC for Interconnector BM Units

Revised treatment of RCRC for Interconnector BM Units
Read More

P284 – Expansion of Elexon’s role via the ‘contract model’

Expansion of Elexon’s role via the ‘contract model’
Read More

P283 – Reinforcing the Commissioning of Metering Equipment Processes

Reinforcing the Commissioning of Metering Equipment Processes
Read More

P282 – Allow MVRNs from Production to Consumption or Vice Versa

Allow MVRNs from Production to Consumption or Vice Versa
Read More

P281 Change of BSCCo Board of Directors & Chairman

Change of BSCCo Board of Directors & Chairman
Read More

P280 Introduction of new Measurement Classes

Introduction of new Measurement Classes
Read More

P279 Correcting the BSC description of the CDCA to SVAA interface for GSP Group net Export

Correcting the BSC description of the CDCA to SVAA interface for GSP Group net Export
Read More

P278 Treatment of Transmission Losses for Interconnector Users

Treatment of Transmission Losses for Interconnector Users
Read More

P277 Allow Interconnector BM Units to choose their P/C Status

Allow Interconnector BM Units to choose their P/C Status
Read More

P276 Introduce an additional trigger/threshold for suspending the market in the event of a Partial Shutdown

Introduce an additional trigger/threshold for suspending the market in the event of a Partial Shutdown
Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.