Glossary
List of all BSC Modifications
P355 – Introduction of a BM Lite Balancing Mechanism
Introduction of a BM Lite Balancing Mechanism
P354 – Use of ABSVD for non-BM Balancing Services at the metered (MPAN) level
Use of ABSVD for non-BM Balancing Services at the metered (MPAN) level
P353 – Align Section B with the intent of P324
Align Section B with the intent of P324
P352 – Housekeeping changes to BSC Section M
Housekeeping changes to BSC Section M
P351 – Align the BSC with changes to the SCR requirements
Align the BSC with changes to the SCR requirements
P350: Zonal Transmission Losses
Introduction of a seasonal Zonal Transmission Losses scheme
P349 – Facilitating Embedded Generation Triad Avoidance Standstill
Facilitating Embedded Generation Triad Avoidance Standstill
P348 – Provision of gross BM Unit data for TNUoS charging
Provision of gross BM Unit data for TNUoS charging
P347 – Reduction in R1 Read Requirement for Half Hourly Sites
Reduction in R1 Read Requirement for Half Hourly Sites
P346 – Changes to the BSC Specified Charges to facilitate Elective HH settlement
Changes to the BSC Specified Charges to facilitate Elective HH settlement