List of all BSC Modifications

(Showing items 101-110 of 475)

Show 10 | 20 | 50 | 100 | All

P375 ‘Settlement of Secondary BM Units using metering behind the site Boundary Point’

P375 will allow Metering Equipment situated ‘behind’ the defined Boundary Point to be used for Settlement purposes in place of the Boundary Point Meter. Primarily, this will allow balancing-related services on-site from smaller assets to be separated from current imbalance-related activities, more accurately reflecting the balancing-energy volumes provided by the Balancing Service Provider (BSP).

Read More

P374: Aligning the BSC with EBGL

Aligning the BSC with the EBGL change process and derogation approach
Read More

P373: Reversal of P297

Reversing the changes relating to Approved Modification P297
Read More

P372: Speeding up the approval process for the publication of BSC data on the BMRS

Speeding up the approval process for the publication of BSC data on the BMRS
Read More

P371 Inclusion of non-BM Fast Reserve actions into the Imbalance Price calculation

Levelling the playing field - Inclusion of Spin-Gen, Non-BM Fast Reserve and Non-Tendered Fast Reserve actions into the calculation of the Imbalance Price and extension of the cash-out price arrangements to Fast Reserve
Read More

P370: Allowing non-BSC Parties to raise Modifications

P370 'Allow the Panel to designate non-BSC Parties to raise Modifications'
Read More

P369: National Grid Legal Separation

P369 proposes to modify the Balancing Settlement Code (BSC) to reflect the creation of a new National Grid Electricity System Operator (NGESO) that is legally separate from National Grid Electricity Transmission Limited (NGET).

Read More

P368: Section Z and PAF Procedures

P368 seeks to amend provisions in the timing and revision of the PAF Procedure documents in order to support the objectives of the Performance Assurance Framework (PAF) Review in delivering a more efficient and effective PAF.

Read More

P367: Removal of SBR and DSBR arrangements

P367 proposes to remove the Supplemental Balancing Reserve (SBR) and Demand Side Balancing Reserve (DSBR) arrangements from the Balancing and Settlement Code (BSC). 

Read More

P366 Change to Supplier Charge SP08a for hard-to-read sites

P366 proposed amending how Supplier Charge SP08a is applied to Non Half Hourly non-Domestic Meters that are hard-to-read (HTR). It is believed that applying Supplier Charge SP08a to HTR Metering Systems is anti-competitive and limits consumer choice. 

Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.