BSC Changes impacting a Supplier

Glossary

This page shows which Modifications and Change Proposals have been identified as impacting a Supplier. Please note that the assessment of where impacts may affect certain roles within the electricity market may be amended during the course of the Change process.

(Showing items 1-10 of 79)

Show 5 | 10 | 20 | All
Sort By Last Updated Date: ASC | DESC

P469 Credit Default Refusal and Rejection Period

P469 proposal seeks to delay the Credit Default Refusal and Rejection Periods. This change would give parties a two-hour window from the Level 2 Credit Default notification until the time when any Energy Contract Volume Notifications (ECVN) related to a defaulting party are rejected.

To implement the proposed Solution, this Modification aims to change BSC Section M, 3.3.3 a (i) and (ii).

Read More

P472 Amendment to provisions for Parties to bring claims against BSC Agents in BSC Section E

This Modification proposes to amend BSC Section E to remove the requirement for Parties to be able to bring claims against BSC Agents. An industry Workgroup will be formed to consider what other measures (if any) might be appropriate to mitigate the impact of this on Parties.

 

Read More

P461 Accurate Reporting of Customers Delivered Volumes to Suppliers

The details reported to Suppliers when a customer delivers a Bid Offer Acceptance (BOA) through a Virtual Lead Party (VLP) do not reflect any adjustments made to that data in Settlement. This Modification proposes to address this issue by amending the values reported to Suppliers.

 

Read More

P474 Governance, funding and operation of the DIP

This Modification proposes changes to the BSC to enable the ongoing governance, funding and operation of the Data Integration Platform (DIP).

Read More

P475 Allowing All Storage Sites to set and fix their own Production/Consumption Flags

The purpose of this Modification is to address the issue of storage BM Units flipping between Production (P) and Consumption (C) statuses. This flipping leads to significant financial challenges for parties managing large storage units. The proposal seeks to allow storage BM Units to fix their P/C status, thereby mitigating these challenges.

Read More

P471 Amendment to BSC Section E to allow more flexibility in procurement of BSC Agents

To allow more flexibility in the requirements for procurement of BSC Agents, to allow the option of having these systems operated by the service provider who developed them (at least for the duration of the transition period), while the currently-appointed Supplier Volume Allocation Agent (SVAA) continues to operate legacy processes.

Elexon will hold a webinar on Thursday 27th June to discuss P471 and P472. If you are interested, please sign up via this form

Read More

CP1591 New Site Visit Check Code Valid Set value

The implementation of Distribution Connection and Use of System Agreement (DCUSA) Modification DCP411 ‘Charging De-energised sites’ involves updating the J0024 data set by adding a new Enumeration Value.

Read More

P467 Enduring Solution in an event of a Gas Deficit Emergency (GDE)

This is a follow on Modification from Issue 105 and provides an enduring solution in an event of a Gas Deficit Emergency (GDE). 

Read More

P463 Introduce a Standard Change Process

To introduce a new change process – a ‘Standard Change’ process – into the BSC arrangements that would allow for certain, low risk, predictable and repeatable pre-authorised changes to be implemented without following the existing Change Proposal or Modification procedures.

Read More

CP1595 Correcting the D0148 flow in BSCP520 – CP1590 fix

CP1595 will remove D0148 from 3.1.12 in BSCP520: Unmetered Supplies Registered in SMRS. The change will ensure references to the Data Transfer Network flows (D0148 in this case) is inputted for its correct use.

Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.