BSC Changes impacting Metered Volume Reallocation Notification Agent

Glossary

This page shows which Modifications and Change Proposals have been identified as impacting a Metered Volume Reallocation Notification Agent (MVRNA). Please note that the assessment of where impacts may affect certain roles within the electricity market may be amended during the course of the Change process.

(Showing items 1-3 of 3)

Show 5 | 10 | 20 | All
Sort By Last Updated Date: ASC | DESC

P456 Enable Elexon to procure ancillary Technology Services for use by BSC Agents

Removing barriers in BSC Section E that would prevent Elexon updating BSC Agent contracts, therefore enabling BSC Agents to use Technology Services procured by Elexon. This should reduce costs for BSC Parties.

Read More

P463 Introduce a Standard Change Process

To introduce a new change process – a ‘Standard Change’ process – into the BSC arrangements that would allow for certain, low risk, predictable and repeatable pre-authorised changes to be implemented without following the existing Change Proposal or Modification procedures.

Read More

P475 Allowing All Storage Sites to set and fix their own Production/Consumption Flags

The purpose of this Modification is to address the issue of storage BM Units flipping between Production (P) and Consumption (C) statuses. This flipping leads to significant financial challenges for parties managing large storage units. The proposal seeks to allow storage BM Units to fix their P/C status, thereby mitigating these challenges.

Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.